Home ProductsMAP Packaging Machine

Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW

Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW

  • Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW
  • Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW
Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW
Product Details:
Place of Origin: SICHUAN,CHINA
Brand Name: RODBOL
Certification: CE/ISO9001
Model Number: RD800
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: Wood case
Payment Terms: L/C, T/T
Supply Ability: 5sets/10days
Contact Now
Detailed Product Description
Type: Vacuum Packing Machine Condition: New
Brand New: Rodbol Weight: 650kg
Warranty: 1 Year Model: RD800
High Light:

110V Chamber Vacuum Packing Machine

,

220V Chamber Vacuum Packing Machine

,

5.5kw map packaging equipment

110v/220v Modified Atmosphere Double Chamber Sausage Sealing Bag Vacuum Packing Machine

 

Product Description:

  

  The double-chamber vacuum packaging machine series is equipped with two chambers. When the product is packaged in the first chamber, the second chamber can be unloaded and loaded again. This makes the packaging process particularly effective. The dual-chamber machine is easy to operate, clean and maintain. They are suitable for product packaging of large-scale production enterprises. The lid has two drive modes: manual and pneumatic. The gas flushing process ensures repeatable packaging results.

 

Product name Double Chamber Vacuum Machine
Machine Dimension(mm) 1910x1025x1080
Chamber Dimension(mm) 920x890x280
Sealer Dimension(mm) 800x8x2
Pump Capacity(m3/h) 200
Power Consumption(kw) 5.5
Voltage (V) 380/415
Frequency(Hz) 50/60
Production Cycle(times/min) 1-2
G.W(kg) 757
N.W(kg) 650
Shipping Dimension(mm)

1980x1090x1300

 

 

FAQ
1. How to pay? What is the payment term?
We accept L/C, Western Union, T/T
Payment terms: 30% of the deposit, 70% of the balance before shipment.

 

2. How do we test your machine?
After the machine is ready, we will send you a video for inspection, and you can also come to our factory to test and learn how to operate.

 

3. How many days is the machine ready?
It will take about 15-30 working days after receiving your prepayment.
We ship by express, sea, and airport.

 

4.How to get your machine after shipment?
We will give you all the documents to get the machine.

 

Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW 0Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW 1Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW 2Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW 3Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW 4Modified Atmosphere Double Chamber Vacuum Packing Machine 110V 220V 5.5KW 5

Contact Details
Chengdu RODBOL Machinery Equipment Co., LTD.

Contact Person: salesmanager

Tel: 86-17360103964

Send your inquiry directly to us
Best Products
Other Products